execute-plan

SKILL.md

Execute Plan

Overview

Execute a pre-approved plan with strict adherence to scope, sequence, and verification.

The input is typically:

  • execute-plan docs/plans/YYMMDD-HHmm-<plan-slug>/SUMMARY.md
  • or shorthand: execute-plan docs/plans/YYMMDD-HHmm-<plan-slug>

Do not redesign the plan during execution. If ambiguity or blockers appear, stop and ask.

Workflow

Step 1: Initialize

  1. Locate Plan

    • Confirm the plan path exists and is readable.
    • If a directory is provided, locate SUMMARY.md inside it.
  2. Load Execution Context

    • Load project context per the shared Context Loading Protocol.
    • Review the plan’s phase files and dependencies.
  3. Select Execution Mode (Explicit Rule)

    • Default mode: Batch
    • Use Interactive when any of the following is true:
      • High-risk changes (auth, payments, migrations, security-critical logic)
      • Irreversible operations (data migrations, destructive scripts)
      • Unclear acceptance criteria
      • User explicitly requests checkpoints
    • If mode is unclear, ask once and proceed with user choice.
  4. Find Next Pending Phase

    • First [ ] phase
    • If none, first [-] phase
    • If no pending/in-progress phases remain, go to final verification.
  5. Critical Plan Sanity Check

    • Ensure each phase has:
      • clear objective
      • file targets
      • verification commands
    • If essential details are missing or contradictory, stop and request clarification.

Step 2: Execute Per-Phase Loop

For each phase in order:

  1. Skip Completed

    • If status is [x], continue to next phase.
  2. Mark In Progress

    • Update phase status to [-] before making changes.
  3. Execute Exactly

    • Implement only the tasks defined in that phase.
    • Do not expand scope without approval.
  4. Verify Phase

    • Run the phase-specific verification commands from the plan.
    • At minimum, run relevant tests/checks tied to touched files.
  5. Handle Failures

    • If verification fails:
      • Attempt focused fixes within phase scope.
      • Re-run verification.
    • If still failing or root cause is outside scope, stop and report blocker.
  6. Mark Complete

    • Update phase status to [x] only after verification passes.
  7. Progress Report

    • Interactive mode: report and wait for confirmation before next phase.
    • Batch mode: report briefly and continue immediately.

Step 3: Final Verification

After all phases are complete:

  1. Project-Wide Validation

    • Run full lint/type-check suite
    • Run all relevant tests (or full test suite if required by the plan)
    • Run build verification if applicable
  2. Stabilize

    • Fix regressions introduced during execution.
    • Re-run failed checks until green or blocked.
  3. Manual Validation Checkpoint

    • If user/manual QA is required, ask explicitly and pause:
      • Verified to accept
      • or provide feedback for follow-up iteration

Step 4: Completion Artifacts

  1. Documentation Sync

    • If behavior/architecture/codebase expectations changed, update the docs artifacts.
  2. Create Execution Report

    • File: docs/plans/YYMMDD-HHmm-<plan-slug>/EXECUTION-REPORT.md
    • Include all required sections below.
  3. Announce Completion

    • Output: Execution complete. Report created at <relative-path>.

Execution Report Standard

EXECUTION-REPORT.md must use this structure:

Execution Report:

Date: YYYY-MM-DD HH:mm:ss
Mode: Batch | Interactive

Summary

  • Overall result (Completed | Completed with follow-ups | Blocked)
  • High-level outcome in 2-4 bullets

Phase Results

  • Phase 1: — ✅/⚠️
    • Implemented:
    • Verification:
    • Notes:
  • Phase 2: ...

Verification Matrix

  • Lint: pass/fail (command)
  • Type-check: pass/fail (command)
  • Tests: pass/fail (command)
  • Build: pass/fail (command)
  • Manual QA: pass/fail/pending

Deviations

  • List any approved deviations from the original plan.
  • If none: None.

Blockers and Resolutions

  • Blocker:
  • Impact:
  • Resolution:
  • Status:

Follow-ups

  • Remaining tasks, if any
  • Recommended owner/next action

Changed Files

  • Relative path list (grouped by area if large)

Rules

  • Follow the plan strictly: no silent scope changes.
  • Stop on blocker: missing dependency, contradictory instructions, or unexplained failures.
  • No guessing: ask for clarification when uncertain.
  • Verify before complete: never mark phase done without passing checks.
  • Idempotency: prefer safe/re-runnable operations.
  • Respect project standards: follow docs/code-standard.md and related project docs.
  • Do not skip workflow steps: initialization, per-phase verification, final verification, and reporting are all mandatory.
Weekly Installs
114
GitHub Stars
32
First Seen
Feb 28, 2026
Installed on
claude-code95
cursor81
github-copilot69
gemini-cli62
antigravity59
opencode56