launch-plan

SKILL.md

Launch based on the size of the bet, not the size of your ambition. Most features deserve a silent or soft launch. Save the big-bang for genuinely new products or major pivots. Linear's principle: launch early, launch often, launch multiple times.

Launch Tiers

Tier 1: Silent Launch

Ship it, turn it on, see what happens. No announcement.

Use for: Bug fixes, minor improvements, internal tools, infrastructure changes, experiments.

Checklist:

  • Feature is behind a flag or gradually rolled out
  • Monitoring/alerting is in place
  • Rollback plan exists
  • One person is on point to watch metrics for 24 hours

Tier 2: Soft Launch

Ship it, tell existing users, collect feedback before going wide.

Use for: New features for existing users, significant UX changes, pricing changes, beta programs.

Checklist:

  • Changelog entry or in-app notification written
  • Help docs updated (or created)
  • Support team briefed with FAQ
  • Feedback collection mechanism in place (survey, feedback button, Slack channel)
  • Known limitations documented
  • Rollback plan exists
  • 1-2 week feedback period before going wide

Example: Launching real-time collaboration — Changelog: "Edit together, see cursors live." Support FAQ covers latency expectations and max concurrent editors. Roll out to 20% of teams for 3 days via feature flag, then 100%. Rollback: disable WebSocket sync, fall back to polling. Feedback widget live for 2 weeks. Success metric: % of teams with 2+ simultaneous editors.

Tier 3: Big-Bang Launch

Coordinated, public, designed for maximum reach. Expensive in time and attention.

Use for: New product launch, major pivot, rebrand, entering a new market. Maximum 2-3 per year.

Checklist:

Product

  • Feature complete and tested at scale
  • Onboarding flow tested with 5+ new users
  • Performance benchmarked under expected load

Content

  • Landing page or product page live
  • Blog post / announcement written
  • Demo video or screenshots prepared
  • Social posts drafted for launch day and day +1, +3, +7

Distribution

  • Email to existing users scheduled
  • Social media posts queued
  • Community posts drafted (relevant subreddits, Slack groups, Discord)
  • Product Hunt launch prepared (if applicable)
  • Influencer/partner outreach done 1 week before

Support

  • Support team briefed and staffed for launch day
  • FAQ and known issues documented
  • Escalation path defined

Measurement

  • Success metrics defined before launch (not after)
  • Analytics tracking verified
  • Daily review scheduled for first week

Post-Launch

Regardless of tier:

  1. Day 1: Watch metrics. Fix anything broken. Respond to all feedback.
  2. Day 3: First retro — what's working, what's not, what surprised you.
  3. Week 1: Decide whether to iterate, expand, or pull back.
  4. Week 2-4: Write up learnings. Update the roadmap based on real data.

Guidelines

  • CRITICAL: Default to Tier 1 or 2. Upgrade to Tier 3 only with strong justification. Over-launching creates announcement fatigue.
  • NEVER launch without a rollback plan. If you can't revert, you're not ready.
  • ALWAYS define success metrics BEFORE launch, not after. Post-hoc metrics are just storytelling.
  • NEVER launch on a Friday. Launch Monday-Wednesday to have the week for monitoring and iteration.
  • ALWAYS have one person on point for the first 24 hours. Launches without owners drift.
  • NEVER do a big-bang launch for features with known bugs. Soft launch first, fix, then go wide.

Built on Linear's "launch multiple times" philosophy. Skills from productskills.

Weekly Installs
10
GitHub Stars
28
First Seen
Feb 18, 2026
Installed on
opencode10
claude-code10
gemini-cli9
github-copilot9
codex9
kimi-cli9