critical-path-analyzer
Critical Path Analyzer
Business Case
Problem Statement
Schedule management requires understanding:
- Which activities are critical?
- How much float exists?
- What delays impact completion?
- Where to focus resources?
Solution
Analyze schedule network to identify critical path, calculate float, and provide actionable schedule insights.
Technical Implementation
import pandas as pd
import numpy as np
from typing import Dict, Any, List, Optional, Set
More from datadrivenconstruction/ddc_skills_for_ai_agents_in_construction
cad-to-data
Convert CAD/BIM files to structured data. Extract element data from Revit, IFC, DWG, DGN files.
155dwg-to-excel
Convert AutoCAD DWG files (1983-2026) to Excel databases using DwgExporter CLI. Extract layers, blocks, attributes, and geometry data without Autodesk licenses.
126drawing-analyzer
Analyze construction drawings to extract dimensions, annotations, symbols, and metadata. Support quantity takeoff and design review automation.
85cost-estimation-resource
Calculate construction costs using resource-based method. Estimate project costs from work items, physical resource norms, and current prices.
63pandas-construction-analysis
Comprehensive Pandas toolkit for construction data analysis. Filter, group, aggregate BIM elements, calculate quantities, merge datasets, and generate reports from structured construction data.
45bim-consistency-checker
Check BIM model consistency: naming conventions, parameter completeness, spatial relationships, and data integrity across model elements.
43