experiment-design-kit
Installation
SKILL.md
Experiment Design Kit Skill
When to Use
- Translating raw ideas into testable hypotheses with clear success metrics.
- Ensuring experiment briefs include guardrails, instrumentation, and rollout details.
- Coaching pods on best practices for multi-variant or multi-surface tests.
Framework
- Problem Framing – define user problem, business impact, and north-star metric.
- Hypothesis Structure – "If we do X for Y persona, we expect Z change" with assumptions.
- Measurement Plan – primary metric, guardrails, min detectable effect, power calc.
- Variant Strategy – control definition, variant catalog, targeting, and exclusion rules.
- Operational Plan – owners, timeline, dependencies, QA/rollback steps.
Templates
- Experiment brief (context, hypothesis, design, metrics, launch checklist).
- Guardrail register with thresholds + alerting rules.
- Variant matrix for surfaces, messaging, and states.
- GTM Agents Growth Backlog Board – capture idea → sizing → prioritization scoring (ICE/RICE) @puerto/README.md#183-212.
- Weekly Experiment Packet – includes KPI guardrails, qualitative notes, and next bets for Marketing Director + Sales Director.
- Rollback Playbook – pre-built checklist tied to lifecycle-mapping rip-cord procedures.
Tips
- Pressure-test hypotheses with counter-metrics to avoid local optima.
- Document data constraints early to avoid rework during build.
- Pair with
guardrail-scorecardto ensure sign-off before launch. - Apply GTM Agents cadence: Monday backlog groom, Wednesday build review, Friday learnings sync.
- Require KPI guardrails per stage (activation, engagement, monetization) before authorizing build.
- If a test risks Sales velocity, include Sales Director in approval routing per GTM Agents governance.
GTM Agents Experiment Operating Model
- Backlog Intake – ideas flow from GTM pods; Growth Marketer tags theme, objective, expected impact.
- Prioritization – score with RICE + qualitative "strategic fit" modifier; surface top 3 bets weekly.
- Design & Instrumentation – reference Serena/Context7 to patch code + confirm documentation.
- Launch & Monitor – use guardrail-scorecard to watch leading indicators (churn, complaints, latency).
- Learning Loop – run Sequential Thinking retro; document hypothesis, result, decision, follow-up in backlog card.
KPI Guardrails (GTM Agents Reference)
- Activation rate change must stay within ±3% of baseline for Tier-1 segments.
- Revenue per visitor cannot drop more than 2% for more than 48h.
- Support tickets tied to experiment variant must remain <5% of total volume.
Weekly Experiment Packet Outline
Week Ending: <Date>
1. Portfolio Snapshot – tests live, status, KPI trend (guardrail vs actual)
2. Key Wins – hypothesis, uplift, next action (ship, iterate, expand)
3. Guardrail Alerts – what tripped, mitigation taken (rollback? scope adjust?)
4. Pipeline Impact – SQLs, ARR influenced, notable customer anecdotes
5. Upcoming Launches – dependencies, owners, open questions
Share packet with Growth, Marketing Director, Sales Director, and RevOps to mirror GTM Agents's cross-functional communication rhythm.
Related skills
More from gtmagents/gtm-agents
cold-outreach
Master cold email, LinkedIn, and first-touch prospect outreach. Use when crafting outbound sequences, social touches, or follow-ups that must earn fast responses.
278technical-bid-library
Central repository structure for manufacturing RFP responses, compliance
83procurement-playbook
Use to manage legal, security, and procurement workflows for complex
80fraud-detection
Use to monitor, investigate, and prevent abuse within referral programs.
75scriptwriting
Use when crafting scripts, storyboards, and messaging for video content.
75storytelling
Use when crafting narratives that connect product value to customer pain through clear setup-conflict-resolution arcs.
65