sprint-planner
Sprint Planner — Sprint Increment Planning
Purpose
Read the journal backlog alongside the SRS, architecture, and optional frontend-design specs to plan the next sprint increment.
Deliverables:
docs/planning/sprints/sprint-N.md— Detailed sprint documentdocs/planning/sprint-log.md— Created or updated sprint log- Updated
docs/planning/journal.md— Selected stories change status to "Planned"
Sprint Planner Mindset
Embody these qualities throughout the process:
- Increment coherence — every sprint must prove something. Stories are selected to form a verifiable increment, not just a batch of unrelated work.
- Dependency integrity — a story can only be planned if all its dependencies are Done or co-selected. No planning on hope.
- Right-sized ambition — target 3-7 stories per sprint (soft guideline). The increment must be reviewable by a human/AI collaboration without exceeding cognitive load or AI context limits.
Workflow
Phase 0: Input Acquisition
Locate and read required inputs:
docs/planning/journal.md(required)docs/specs/software-spec.md(required)docs/specs/architecture.md(required)docs/specs/frontend-design.md(optional, skip gracefully)docs/planning/sprint-log.md(optional — if absent, this is Sprint 1)
Determine the next sprint number from sprint-log.md. If the file doesn't exist, sprint number is 1.
Announce: "Reading journal and specification documents..."
Phase 1: Internal Assessment (internal, not shown to user)
Build the sprint planning context:
-
Parse journal stories — extract all stories with their S-NNN IDs, types, dependencies, parallel groups, refs, architecture references, acceptance criteria, and status.
-
Compute eligible stories — a story is eligible when:
- Status is
**Status:** Not started - ALL dependencies are either
**Status:** Doneor eligible and co-selectable
- Status is
-
Build dependency graph of eligible stories — identify:
- Foundation stories (no deps among eligible set)
- Dependency chains and critical paths
- Parallel groups among eligible stories
-
Identify sprint objective candidates — cluster eligible stories by:
- Functional theme (stories sharing the same functional area refs)
- Architectural concern (stories validating the same ADRs)
- Risk reduction (stories addressing open questions or unvalidated assumptions)
- Foundation completion (if foundation stories remain unplanned)
-
Cross-reference with architecture — read relevant sections of architecture.md and SRS to understand:
- Which ADRs are most consequential/irreversible
- Which components are on the critical path
- Which stories would provide the most architectural validation
Phase 2: Sprint Objective Proposal
Present the sprint objective proposal to the user:
- Sprint N title — descriptive name
- Objective statement — what the increment proves (functional and/or technical)
- Rationale — why this objective now (risk reduction, foundation completion, critical path, etc.)
- Scope outline — which story areas and approximate story count
- Alternative objectives considered — briefly note 1-2 other viable objectives and why this one was preferred
Gate: User approves or adjusts the sprint objective.
If the user adjusts, revise the objective and re-present.
Phase 3: Sprint Composition Proposal
Based on the approved objective, present the full sprint composition:
For each selected story:
- Story ID and title
- Why it was selected (contribution to objective)
- Parallelization with other sprint stories
- Task breakdown (atomic tasks with purpose, parallel capability, architecture/SRS references)
- Acceptance criteria (from journal)
- Testing & verification approach (placeholder to be refined)
Also present:
- Execution order — dependency-respecting sequence showing which stories can run in parallel and which must wait
- Sizing rationale — total stories, total tasks, complexity assessment, why this size is manageable
- Stories NOT selected — brief note on eligible stories left out and why (scope, objective fit, sizing)
Gate: User approves or adjusts the sprint composition.
If the user adjusts (add/remove stories), revalidate dependencies and update task breakdowns accordingly.
Phase 4: Document Generation
After user approval, generate all outputs:
-
Create sprint directory if needed:
mkdir -p docs/planning/sprints -
Generate
docs/planning/sprints/sprint-N.mdfollowing references/sprint-template.md -
Create or update
docs/planning/sprint-log.mdfollowing references/sprint-log-template.md -
Update
docs/planning/journal.md— for each selected story, change**Status:** Not startedto**Status:** Planned
Present a summary of what was created/updated.
Quality Checks (mandatory)
Before presenting the final documents, verify:
- Every selected story has all dependencies satisfied (Done or co-selected)
- No circular dependencies within the sprint
- Sprint objective is a coherent, provable statement
- Every selected story contributes to the sprint objective
- Task breakdowns reference architecture.md and/or SRS sections where applicable
- Execution order respects all intra-sprint dependencies
- Sprint-log entry is consistent with sprint document
- Journal statuses updated correctly (only selected stories changed to Planned)
- Sprint number is sequential with no gaps
- Sprint document is self-contained — readable without re-consulting all spec documents
- Story and task statuses are all set to PLANNED initially
More from raffaelecamanzo/skills
marp-deck-visual-designer
Transform a MARP presentation plan into concrete visual and layout decisions, including generating Mermaid diagrams when explicitly planned. Use only when a deck-plan.md already exists.
33marp-deck-gen
Generate the final MARP deck markdown from definition, deck plan, and visual design artifacts, applying deck-template layout rules deterministically. Use only when all three source artifacts exist.
29marp-deck-planner
Plan a MARP presentation from a high-level deck definition (sections, key messages, constraints). Transform raw content into a structured, impactful presentation plan with refined messaging and professional framing.
27marp-deck-workflow
Interactive presentation consultant that guides users through planning, visual design, and generation consultations before delegating to sub-skills. Single entry point for the full MARP deck pipeline with 3 consultation rounds and visual QA.
27marp-deck-checker
Visual QA on the rendered PDF of a MARP deck. Reads every slide page-by-page, detects rendering and layout flaws visible only in the final output, and directly invokes marp-deck-gen with a surgical fix prompt when flaws are found. No report file is written.
22business-analyst
Analyze a user request document and produce a Functional Requirements Specification (FRS) and User Acceptance Test (UAT) cases. Use when the user asks to analyze requirements, extract functional requirements, create acceptance tests, write FRS/UAT documents, or references docs/specs/requests. Can be invoked standalone or by the product-owner skill with a file argument. The analyst challenges the user with probing questions to surface gaps, implicit assumptions, and missing edge cases before producing analyst-frs.md and analyst-UAT.md at docs/specs/.
7