jira-story-point

Installation
SKILL.md

Jira Story Point Estimator

Estimate the total effort for a PBI to reach the team's Definition of Done (DoD), using Jira evidence and the team's Fibonacci scale. The estimate includes implementation, testing, review, documentation/configuration, and the work needed to push or release the PBI when those activities are part of the DoD. Produce a local estimate by default. An explicit instruction to estimate and update authorizes the specified write after preparing the estimate; ask only if the destination field or intended value remains ambiguous.

Workflow

1. Fetch the ticket

  1. Discover available Jira tools by capability and resolve the intended site from verified task context.
  2. Fetch the issue using the available issue-retrieval tool.
  3. Extract the issue key, type, summary, description, acceptance criteria, priority, labels, components, parent/linked issues, dependencies, and any existing Story Point field.
  4. Extract the DoD if it is present in the Jira ticket, project documentation, or team context. If it is unavailable, use the DoD coverage checklist below and mark the affected items as assumptions.
  5. If the ticket is missing a description or acceptance criteria, state that the estimate is provisional and list the missing information. Do not fill gaps with invented requirements.

2. Gather calibration evidence

Search for 3–8 recently completed issues from the same project with available Story Points. Prefer matches in this order:

Installs
33