Weekly Report

软件研发周报生成助手。自动扫描 ~/code/ 下所有项目的 schedule YAML 和 git log, 结合前几周周报做对比,生成结构化的三段式周报,写入 Obsidian 日记。

Prerequisites

Tool Type Required Install
git cli Yes brew install git
reminders-cli cli Yes brew install keith/formulae/reminders-cli
macOS Calendar system Yes Built-in, access via osascript
gh cli No brew install gh then gh auth login — for GitHub PR/Issue data
yunxiao skill No For 云效 MR/Task/Bug data (invoke via Skill tool)

Path Dependencies

Path Purpose Required
~/code/*/ Monorepo workspaces (git repos + schedule YAMLs) Yes
~/code/*/planning/schedules/*.yaml Project schedule definitions No (skip projects without schedule)
~/code/*/repos/*/ Sub-repos within each monorepo workspace No (scanned automatically if present)
Obsidian daily notes directory Daily diary files with Work Log entries + report output Yes

The Obsidian vault path is auto-detected by scanning ~/Library/Mobile Documents/iCloud~md~obsidian/. If not found, ask the user.

Do NOT proactively verify tools or paths on skill load. If a command fails due to a missing tool, skip that data source and continue with what's available.

Workflow Overview

  1. Confirm → 2. Find previous → 3. Collect data (parallel) → 4. Draft → 5. Review + write → 6. Schedule next week
┌──────────────────────────────────────────────────────────────────┐
│                weekly-report 完整流程(~20min)                    │
└──────────────────────────────────────────────────────────────────┘

  ┌──────────────┐
  │ 用户触发周报  │
  └──────┬───────┘
  ┌────────────────────────────────────┐
  │ 1. 确认周期 + 定位文件    (~1min)   │
  └──────┬─────────────────────────────┘
  ┌────────────────────────────────────┐
  │ 2. 查找前几周周报         (~1min)   │
  │    提取上周「下周工作计划」         │
  └──────┬─────────────────────────────┘
  ┌─────────────────────────────────────────────────┐
  │ 3. 并行数据收集(subagent)          (~3-5min)   │
  │    ┌─ 本周日记 Work Log(各工作日)              │
  │    ├─ Schedule YAML(本周 + 下周模块)           │
  │    ├─ Git log(~/code/*/ 全扫描)                │
  │    ├─ GitHub PR/Issue(gh CLI)                  │
  │    └─ 云效 MR/Task/Bug(yunxiao skill)          │
  └──────┬──────────────────────────────────────────┘
  ┌────────────────────────────────────┐
  │ 4. 交叉比对 + 生成草稿    (~3min)   │
  │    上周计划 vs 本周实际             │
  └──────┬─────────────────────────────┘
  ┌────────────────────────────────────┐
  │ 5. 用户审阅 + 修改        (~5min)   │
  │    展示草稿 → 用户调整 → 写入日记  │
  └──────┬─────────────────────────────┘
  ┌────────────────────────────────────┐
  │ 6. 创建下周日程 + 提醒    (~3min)   │
  │    Calendar time block             │
  │    Reminders 任务列表              │
  └──────┬─────────────────────────────┘
      ┌──────┐
      │ 完成  │
      └──────┘

Step 1: Confirm Period and Target File

  • Report period: Current week's Monday through Friday
  • Target file: The day's daily note (usually last workday of the week)
  • Write location: Under ## 2 Work Log, as ### 软件研发周报(M/D - M/D)
  • Diary path: Scan for Obsidian vault in ~/Library/Mobile Documents/iCloud~md~obsidian/ or ask the user if not found

If today is Saturday/Sunday, default to the previous Friday's daily note. Confirm with the user before proceeding.

Step 2: Find Previous Reports

Scan recent daily notes (previous 14 days) for the heading pattern ### 软件研发周报.

From the most recent previous report, extract:

  1. 「下周工作计划」section → baseline for accountability check (what was planned vs what happened)
  2. Format and style → maintain consistency (project groupings, level of detail, bold patterns)

If no previous report found, skip comparison and proceed — this is normal for the first report.

Step 3: Parallel Data Collection

Launch subagents concurrently. The five data sources are independent — run as many in parallel as possible. If any source fails or is unavailable, skip it and continue.

3a. Daily Notes (Work Log)

Read the daily notes for each workday in the report period (Monday through Friday). Extract content under ## 2 Work Log from each day's note.

This is the richest data source — daily work logs often contain context, decisions, and details that git commits and PR titles don't capture. Prioritize this content when writing the report.

3b. Schedule YAML Scan

Scan ~/code/*/planning/schedules/*.yaml — same directory structure as code-sync (~/code/*/ monorepo workspaces).

For each YAML found:

  1. Read project, title, timeline.start, phases, modules
  2. Calculate the current week number: ceil((today - timeline.start) / 7)
  3. Extract modules where weeks includes current week → this week's work
  4. Extract modules where weeks includes next week → next week's plan
  5. Count status: done modules in current phase → progress fraction (e.g., 4/6)

3c. Git Log Collection

Scan ~/code/*/ and ~/code/*/repos/*/ for git repos (same candidates as code-sync's scan.sh pattern), then for each:

git log --oneline --since="{monday}" --until="{saturday}" --author="{user}" --all

Where {user} is from git config user.name.

Group commits by workspace → repo. This supplements the daily notes — useful for catching work the user forgot to log in their diary.

3d. GitHub Activity (if gh available)

# PRs authored this week
gh search prs --author=@me --created="{monday}..{saturday}" --json repository,title,number,state,url

# Issues authored/assigned this week
gh search issues --author=@me --created="{monday}..{saturday}" --json repository,title,number,state,url

Include merged PRs, open PRs, and closed issues in the report. PR numbers and titles provide concrete references for the boss.

3e. 云效 Activity (if yunxiao skill available)

Spawn a subagent to invoke yunxiao skill via Skill tool:

Agent tool:
- subagent_type: general-purpose
- prompt: |
    Invoke the yunxiao skill to query work activity from {monday} to {friday}.
    Get: MRs authored (merged + open), Tasks assigned (modified this week),
    Bugs assigned (modified this week).
    Return: list of items with identifier, title, status, and dates.

MR numbers (e.g., MR#67) and task identifiers (e.g., YWQO-4) add traceability to the report.

Data Source Priority

When the same work appears in multiple sources, merge intelligently:

Priority Source Strength
1 Daily notes Most context, user's own words, decisions and reasoning
2 Schedule YAML Structured progress, phase tracking, module status
3 GitHub / 云效 Concrete references (PR#, MR#, issue#, task ID)
4 Git log Catch unreported work, verify claims

The daily notes provide the narrative; schedule YAML provides structure; GitHub/云效 provide traceability; git log fills gaps.

Data Source Degradation

Source unavailable Behavior
Daily notes missing for some days Use available days, note gaps
No schedule YAML for a project Include project based on git/daily notes alone, omit progress fraction
gh not installed or auth failed Skip GitHub data, note "GitHub 数据未获取"
yunxiao skill unavailable Skip 云效 data, note "云效数据未获取"
Git log returns nothing Project may have had non-code work (meetings, design) — check daily notes
All remote sources fail Proceed with daily notes + git log only

Step 4: Cross-Reference and Draft

Accountability Check (when previous report exists)

Compare last week's 「下周工作计划」 against this week's actual output:

Last week planned This week status How to handle
Completed Done Include in 本周总结
Partially done In progress Note progress in 本周总结, carry forward to 下周计划
Not started Missed Flag in 其他事项 with reason if known
Unplanned work done New Add to 本周总结 as new item

Project Grouping

Do not hardcode groups. Instead, derive grouping from:

  1. Previous report (if exists): reuse the same project display names and grouping
  2. Schedule YAML title field: use as display name
  3. Common sense merging: repos under the same ~/code/<workspace>/ that share a schedule can be grouped together

Omit projects with zero activity this week.

Draft Generation

Generate three sections following report-template.md.

本周工作总结:

  • Group by project, each header includes phase progress (e.g., 进度 4/6) when available
  • Each project 1-2 bullets max, compress into core deliverables
  • Each bullet: **bold key phrase**: + business-language description
  • Use domain numbers (接口数、页面数、参数个数), NOT internal numbers (commit 数、PR#)
  • Skip entirely: CI/CD changes, version bumps, SDK sub-releases, upstream open-source contributions, internal process improvements (CLAUDE.md, openspec schema)
  • sunlite and sylsmart are separate projects — never merge them

下周工作计划:

  • Source from schedule YAML next-week modules + carry-forward items
  • Include time estimates when known (e.g., (2.5 天))
  • Each bullet: **bold key phrase**: + expected outcome in business terms
  • sunlite and sylsmart must have separate headers with separate time allocations

其他事项:

  • Carry-forward items from last week's plan that didn't get done, with brief reason
  • Handoffs, blockers, cross-team coordination
  • Keep it concise — no technical explanations in parentheses

Step 5: User Review and Write

  1. Present the full draft
  2. Wait for user feedback
  3. Apply changes — important: if user doesn't mention an item, it's fine as-is, do NOT remove it
  4. Write final version to the daily note under ## 2 Work Log

Step 6: Schedule Next Week

After the report is written, parse the 「下周工作计划」 section and create Calendar events and Reminders for next week. This closes the loop — what you wrote in the plan becomes actionable items on your schedule.

Parse Plan Items

From each bullet in 下周工作计划, extract:

  • Task name: the bold key phrase
  • Project: the project header it belongs to
  • Time estimate: if (N 天) is specified

Create Reminders

First check available lists with reminders show-lists, then create items in an appropriate list (prefer "提醒" or the first available work-related list):

reminders add "提醒" "{project}: {task name}" --due-date "next monday"

If a task has a specific day mentioned (e.g., "周三前完成"), use that date instead.

Create Calendar Time Blocks (optional)

If time estimates are available per project, suggest Calendar time blocks. Calculate actual next-week dates (not relative offsets) to ensure accuracy:

# Example: create a time block for next Monday (2026-03-16) 9:00-17:00
osascript -e '
tell application "Calendar"
    tell calendar "工作"
        set startDate to date "2026年3月16日 09:00:00"
        set endDate to date "2026年3月16日 17:00:00"
        make new event with properties {summary:"sylsmart: auth 接口适配", start date:startDate, end date:endDate}
    end tell
end tell'

Defaults

  • Calendar name: "Work " (note trailing space) (with trailing space — verify with osascript -e 'tell application "Calendar" to get name of calendars')
  • Time block: 9:30-11:45 (morning focus block, not full day)
  • No all-day events: Always create timed events, never all-day
  • Reminders list: 提醒

Date calculation

Use current date with day offsets to calculate next week's dates. Do not use hardcoded date strings — they cause locale-dependent parse errors on macOS.

set baseDate to current date
set time of baseDate to 0
set nextMon to baseDate + ({offset} * days)
set startTime to nextMon + (9 * hours) + (30 * minutes)
set endTime to nextMon + (11 * hours) + (45 * minutes)

Present the proposed schedule to the user first — only create after confirmation:

下周日程建议(Work 日历,9:30-11:45):
  周一 3/23: sylsmart - xxx(1 天)
  周二-周三 3/24-3/25: sunlite - xxx(2 天)
  周四 3/26: HA 集成 - xxx(1 天)
  周五 3/27: buffer / 周报

确认创建到 Calendar 和 Reminders 吗?

Important Behaviors

Do not remove items the user didn't mention. During review, the user will only call out things that need changing. Silence means approval. This is a lesson learned from real usage: removing "good" items to make room for user corrections breaks the report.

Business language, not technical jargon. The boss does NOT read code. Write what was done and what it enables, using domain terms (接口、页面、配置参数、用户可以...). Never use: implementation details (Router Factory, Playwright E2E, migration downgrade), internal process names (CLAUDE.md, openspec review schema), version bumps (v0.2.0→v0.2.1), commit/PR counts, or CI/CD details. These are valuable data for collection but must be translated to business outcomes in the final report.

Concrete with business numbers. Use domain-relevant numbers: 14 个接口, 17 个页面, 4 个配置参数, 18 个待确认问题. NOT: 13 commits, PR#78, 91% coverage.

Match previous report style. If a previous report exists, mirror its voice, detail level, and formatting choices. The goal is consistency across weeks so the boss sees a coherent narrative, not a different writing style each time.

Common Issues

Issue Fix
No daily notes found Verify Obsidian vault path, check iCloud sync status
Schedule YAML parse error Validate YAML syntax, check timeline.start date format
Previous report not found Normal for first week — skip accountability check
gh search returns 0 results Check date range format, verify gh auth status
Calendar "工作" not found Run osascript -e 'tell application "Calendar" to get name of calendars' to list available calendars, use an existing one
Reminders list not found Run reminders show-lists and use an available list
Git log shows upstream commits Filter by --author to exclude upstream noise